Floor cinema box (at the back wall of the auditorium) All the equipment for cinema is located. It is assumed that the Customer will supply the D200mm ventilation pipelines with the Customer (inflow and exhaust). Production time from the moment of receipt of prepayment 30 cal. days. Color of boxing is white or black.